Nonsuch House

London Bridge / Nonsuch Hs

On this day in 1577, the first stone was laid for the foundation of Nonsuch House on Old London Bridge, which stood until 1757, when it was demolished to allow for the widening of the road.  The original construction of the House, which took two years to complete, was remarkable for the amount of pre-fabrication involved, with sections manufactured in Holland and shipped across the North Sea packed flat for assembly on site.  And also for the quality of the craftsmanship employed, it even being said that all the sections fitted together with wooden pegs, and without a single nail. The completed House, with its gaudy paintwork, intricately carved carapace, and ornate cupolas, was  one of the wonders of its age. Fortunately, it stood just long enough, albeit apparently in a state of some disrepair, to be immortalised in a Canaletto drawing of circa 1750, now in the British Museum. Unfortunately, we know very little of its nearly two-hundred year history – not even who its occupants were!

The modern incarnation of London Bridge is visited on our “Historic Southwark” standard walk.

Further details of all our walks are available in the “Our Guided Walks” section of this web-site.

Bookings may be made through the “Contact/Booking” section of the web-site (www.lostcityoflondon.co.uk), or by e-mail (lostcityoflondon@sky.com).

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s